EasyManua.ls Logo

FALMEC DIAMANTE - Page 20

FALMEC DIAMANTE
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Phase 2
- Hook the hood to the propping bar (fig. 02).
- Check the hood’s alignment using the fixing screws.(fig. 02). The upper screw (B) set the
distance from the wall, the lower (C) the vertical slide.
Phase 3
To avoid any unhooking of the hood fix it to the wall with the screws and wall anchors sup-
plied as follows:
- through the holes on the back of the hood and any strap on the cover.
- Insert in pipe union D pipe E (fig. 3)
- Should the fixing include a rear flue see fig. A.
Phase 4 (optional)
- Position chimney (G) and extension (H) as shown in fig. 04.
- Insert in G extension H, making it slip until the required height is reached.
- When happy with the location, lean bar L against the wall, check with a spirit level the
horizontal alignment and mark two fixing points at the ends of the bar.
- Drill a hole, insert 2x4 mm. wall anchors and fix bar L with the screw provided.
- Screw extension H to bar L Using screws M.

Related product manuals