EasyManua.ls Logo

FEDCO MSS-40 - Stage Replacement (MSS-40;55;75)

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MSS
TM
Series
© Copyright 2022 Fluid Equipment Development Company | www.fedco-usa.com
- 49 -
1
2
3
4
5
6
7
Item Description
1 Di󰀨user Bearing
2 Floating Neck Ring
3 Di󰀨user
4 Clamping Neck Ring
5 Split Cone Nut
6 Impeller
7 Split Cone
Figure 106 - End Shell Bolt Removal
Stage Replacement (MSS-40/55/75)
TOOLS REQUIRED: Gage block, Shaft wrench or Strap wrench, Torque wrench.
NOTES: Consult a FEDCO representative for all information regarding assembly specications.
ELECTRICAL HAZARD
Make sure to disconnect the power supply to the motor before carrying out component replace-
ment procedures. Follow all Lock out/Tag out procedures developed by your company before
starting any maintenance or repair.
Stage Removal
1. Follow the steps in Stage
Replacement Preparation in the Stage
Replacement (MSS-15/20/30/50/70) section
of this manual.
2. For:
Single Shell Pumps:
Remove the end shell ange bolts from the
inlet ange and safely remove end shell
using safe lifting and handling methods.
Remove the inlet O-ring.
Two Shell Pumps:
Remove the end shell ange bolts from the
series shell ange and safely remove end
shell using safe lifting and handling methods.
Remove the series shell O-ring.
Figure 107 - MSS-40/55/75 Stage Components
Pump Overhaul Continued

Related product manuals