EasyManua.ls Logo

Fenwal 4R5707 - 2 RBC Single Unit Recovery (SUR); Purpose

Default Icon
496 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ALYX COMPONENT COLLECTION SYSTEM OPERATOR’S MANUAL
CHAPTER 4D - 2RBC SINGLE UNIT RECOVERY PROCEDURE
07-19-01-518 – January 2009 4D-13
Typical STOP with Choice to Process Product or Do not
Process Product Overlay
4. Touch the Process product button.
5. Touch the Yes button to confirm the option to not return
fluid and to process the product.
Typical Confirmation Overlay to End Procedure without
Fluid Return and Process Product.
If the ability to both Return fluid to the donor and Process
product are options, the confirmation overlay will ask the
operator to confirm the choice to return fluid to the donor and
process the product. After touching the Yes button, the
instrument will then proceed to reinfuse any fluids collected that
exceed the minimum volume needed to allow for processing a
product.

Table of Contents