Do you have a question about the Festo CPV DI02 Series and is the answer not in the manual?
Details the pin configuration for the M12 power supply connector.
Illustrates connection examples and pin assignments for field bus and power supply.
Explains how to set the PROFIBUS-DP station number using switch elements 1-7.
Describes activating/deactivating device-related diagnosis with switch element 8.
Details connecting CPI/CP modules and CP valve terminals to the CPI extension.
Procedure for saving string assignments using the SAVE button and LED feedback.
| Number of Channels | 2 |
|---|---|
| Operating Voltage | 24 V DC |
| Polarity Reversal Protected | Yes |
| Electrical Isolation | Yes |
| Reverse Polarity Protection | Yes |
| Communication Protocol | PROFIBUS DP |
| Galvanic Isolation | Yes |











