EasyManua.ls Logo

FHM DW30 - 4 ASSEMBLING

FHM DW30
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Farmer-Helper DW30 Chipper 15 Revision 09 - 2017
4 ASSEMBLING
The machine comes from the factory in a shipping
Pdf 19.png
configuration. Always use tools equipment and
forklifts of appropriate size and capacity for the job.
Always use 2 men when lifting, moving and
assembling the machine.
When the machine is shipped, follow this proce-
dure when preparing for the customer:
1. Clear the area of bystanders especially small
children before starting.
2. Use a forklift to lift the pallet/machine from the
truck. Carry the load close to the ground.
3. Move the machine to the assembly area. Be
sure there is sufficient clearance to access the
machine from all sides.
4. Cut the tie-down straps.
5. Lay-out components next to machine.
6. Use a forklift to raise and lift the frame.
7. Or alternatively attach a lifting device to the
SHIPPING
lifting bracket on top of the frame.
8. Remove pallet and place machine on the
ground.
9. Release feed hopper transport latch and lower
hopper into the working position. Stow anchor
latch.
Pdf 20.png