EasyManua.ls Logo

FibroPool FH-020 - Installation Area and Optimization; Water Connection Methods; Electrical Connection Requirements

FibroPool FH-020
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Installation area
Install the unit on a flat, horizontal and stable surface. An HVAC equipment pad is ideal, although 4“ thick
concrete blocks will work as well.
To optimize installation
Allow a minimum of 12” of clearance on all 3 sides, but ensure 36” in front of the service panel
Water connection
The heat pump can be connected to the filtration circuit by one of two methods:
1. With a 3-valve
bypass, placed after the pump and filter. This allows the user to regulate water flow to the pump and
isolate the unit completely for maintenance.
2. Inline with the
system. This will somewhat reduce the flow rate of the filtration system on large circulation pumps.
NOTE
If your pool has a water treatment system (chlorinator, salt generator, brominator etc...) installed, the bypass
must be installed before the water treatment. A check valve after the heater, before the treatment system is
recommended but not required.
Electrical connection
Electrical supply must be installed by a licensed electrician. This unit uses a double pole, 230-240 Vac, 60 Hz
circuit, with a 20-amp breaker. The unit will use a maximum of 9 amps of electricity during operation.
9

Related product manuals