EasyManua.ls Logo

Fizz Nitro-Draught ND0101 - Installation & Operation; Unpacking your Unit; Powering up your Unit

Fizz Nitro-Draught ND0101
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4
Installation & operation
4.1 Unpacking your unit
Remove the items from the box and check for damage. The box contains one Nitro-Draught unit, a
manual, and a power cord. If any of the items are in a damaged condition, request an immediate
inspection by the carrier. If any of the items are missing, please contact Fizz.
4.2 Powering up your unit
Installation quick checklist
1. Unpack and inspect unit
2. Mount unit to a solid and secure surface
3. Plug into suitable electrical outlet
4. Connect unit port “To Storage” to external pressure vessel and start nitrogen production.
Connect a return pressure line from external vessel to unit port “From Storage.
5. Make CO
2
and blend gas connections
6. Connect to draught and wine dispense system
7. Recheck connections and equipment for proper operation
mmder
Nitrogen To
Storage
Nitrogen From
Storage
CO
2
Supply
90 300 psi
Blend Gas
To Kegs

Related product manuals