EasyManua.ls Logo

Franke CT-200 - POST-INSTALLATION CHECKS AND USAGE; Water Supply Activation and Leak Check; Setting Water Temperature

Franke CT-200
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
CT-200
Under Sink Chiller Unit Installation Instructions and Use and Care Guide
4.
16.
9.
6.
5.
12.
12.
14.
15.
13.
13.
1.
SETUP OF CHILLER WITHOUT THE FILTRATION SYSTEM
IMPORTANT: The check valve helps to avoid the possibility of excessive pressure building as the chiller cycles
on and off. If you are NOT installing the chiller with a filtration system, do NOT use tee push fitting (2), check
valve (11), or tee push fitting (10) illustrated in step 7. The setup without the check valve would look like the
Diagram 3.
DIAGRAM 3
9. Slowly turn on water supply. Open the cold water valve and allow the dispensing faucet to run for at
least 1 minute. Check all connections for leaks.
10. Plug in the chiller to a suitable power supply (see electrical requirements section). Prior to drinking
water, flush water through chiller for at least 5 minutes.
USAGE
SETTING THE TEMPERATURE
- Your chiller has a dial for water temperature control.
- For colder water: Turn it clockwise (to the right).
- For less cold water: Turn it counterclockwise (to the left).
- To shut down the chiller: Turn the dial to the Off position at full counterclockwise (extreme left).
- Allow one hour to obtain chilled water.

Related product manuals