EasyManua.ls Logo

Franke FM800 - Installation and Technical Data

Franke FM800
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and technical data
Page 15
FM800 technical data
Bean hopper 1.2kg per grinder
Powder container 1kg per container2 x 0.5kg
(optional double powder dosing unit)
Grounds container 45 cakes (optional: coffee ground chute)
Boiler volume Coffee 0.9 liters at 2.5 kW
Hot water or steam 0.9 liters at 2.5kW
Thermoblock 2kW
Electrical connection 400 V3L N PE7.5 kW50/60 Hz Fuse: 16 A
220 – 240 V1L N PE4.5 kW – 5.4 kW50/60 Hz Fuse: 30 A
(locked)
200 – 240 V3L PE3.6 kW – 5.4 kW50/60 Hz Fuse: 30 A (locked)
Noise emission < 70 dB (A)
Weight Approx. 55 kg
Cold water connection
(optional) G 3/8" outside thread
Water pressure 80 – 800 kPa (0.8 – 8.0 bar)
Shut-off cock With check valve and filter
Water hardness Max. 70 mg CaO/1 l water (7 dH, 13 °fH)
Ideal pH value 7
Funnel d = 50mm (2") with siphon
Drain pipe dmin = 1"
Ambient conditions Humidity: max. 80%
Ambient temperature: 5 - 35 ° C
Energy loss per day* FM800 with KE300: 1.98kWh
* as per DIN 18873-2
Preparations
•The power connection for the coffee machine must be protected
by a ground fault circuit interrupter (GFCI).
•Each terminal of the power supply must be able to be interrupted
by a switch.
•The water connection must have a shut-off cock with a check
valve and filter and must meet the requirements of the technical
data. (Only when being used with a water connection)
•If your coffee machine has an electrical connection other than
the one described in the table opposite, you will have received
additional information regarding the installation with your order
confirmation.
•The water connection to your coffee machine must be accom-
plished with the hose set that is supplied with it. Do not use any
other water hoses that happen to be present.
Installation
You must have completed these preparations before one of our Ser-
vice technicians can install the coffee machine for you.
Your Service technician will install your coffee machine and put it into
operation for the first time. The technician will walk you through the
basic functions.
Your FM800 must be properly installed so that you can operate it correctly – your Service technician will do that for you.
You'll have to take care of a few things first. You'll find the prerequisites for problem-free enjoyment of your coffee ma-
chine here.
Installation and technical data

Table of Contents

Related product manuals