1. Install the cable xing plate, paying attention to keeping the xing
plate hole in line with the center of the side spring pin. (See Figure
14a.)
1. Secure the cable onto the bottom of the beam via cable holder.
(See Figure 16.)
M6 x 25 x 2
2
x 1
3
M6 x 20 x 1
Cable Fixing Plate and Cable Assembly
Cable Holder and Cable Assembly
Handle and Cable Assembly
1. Disassemble the original long control lever (See Figure 15, illustration
1.), assemble the shorter log lift table control lever instead with the
same hardware parts (See Figure 15, illustration 2.)
2
1
Cable
Adjusting Nuts M6 (x3)
3
Cable
Cable Fixing Plate
M6x25 (x2)
Side Spring Pin
10 mm
2. Screw the straight end of the cable into the side spring pin hole.
(See Figure 14b, illustration 1.). Pass the cable between the lower
two adjusting nuts through the middle hole of the cable xing
plate. (See Figure 14b, illustration 2.). By adjusting the three
adjusting nuts, make sure the cable between the side spring pin
and the cable xing plate is just straightened. (See Figure 14b,
illustration 3.)
10 mm
× 2
Figure 14a
Figure 15
Figure 14b
2
1
Log lift table handle ( Shorter)
Original Control Lever ( longer)
Figure 16
8 mm
10 mm
× 2
21
|
Assembly