Page 33
Insert brace tubes into short
tees and fully tighten all grub
screws on dip station.
9
ATTACH OTHER DIP STATION SIDE
Tighten all grub screws.
+ 360
o
FINAL CHECKS
1. Ensure frame is square and level.
2. Firmly tighten all grub screws and bolts.
3. All base plates are pegged down.
1. Check level and square -
Loosen and adjust if not.
2. Hammer in pegs 4x.
3. Check all fixings are fully tight.
10
SECURE TO GROUND
11
Please refer to the maintenance steps at the back of the booklet.