EasyManuals Logo

Gammaflux GLC 2k User Manual

Gammaflux GLC 2k
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Enter
Change Area
Automatic/
Manual Selectionl
Temperature Set Select
Zone select indication
Temperature holding set point
Low temperature alarm
Select
Zone Select/Status Area
GLC 2K Start Up Procedure
1
Dry Cycle Mold, Apply Full Tonnage, 3-4 Times (Pinch any wires in
advance of operation)
2
Turn Individual Zones “Off
3
Turn “On” Main Disconnect
4
Select Zone or Zones, Press 1st Zone, Hold, Press Last Zone, Hold, Release.
All Zones Lit are Selected
5
Change Area – Select Temperature Set, Enter Set Point, Press Enter, All
Zones Selected will Change
6
Select Zone or Zones, Press 1st Zone, Hold, Press Last Zone, Hold, Release.
All Zones Lit are Selected
7
Change Area – Select Automatic/Manual Selection, Enter “0” for Automatic
Operation, Press Enter
8
Turn “On” Zone Power Switch. Apply Power to Manifolds first if required
by Manifold Supplier
9
Zones will read a Low Temperature Alarm, Zones are close or holding Set
Point When the Green Temperature Holding Set Point Light is Illuminated
Gammaflux
Sterling, VA USA Tel. +1-(703) 471-5050
Wiesbaden, Germany Tel. +49-(0)-611-973430
Ube, Japan Tel. +81-(836) 54-4369
www.gammaflux.com; www.gammaflux.de
GLC 2k
Version 1.3
Advanced Setup/Troubleshooting
Hot Runner Temperature Controller
12 Zone Maximum per Tier
•1 HBE-24 Female Connector for
Power per Tier (Standard)
•1 HBE-24 Male Connector for
Thermocouple per Tier (Standard)
Remote Mount Alarm Relay
External Communications RS232/RS485

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gammaflux GLC 2k and is the answer not in the manual?

Gammaflux GLC 2k Specifications

General IconGeneral
BrandGammaflux
ModelGLC 2k
CategoryController
LanguageEnglish