EasyManua.ls Logo

GDS DRIVE 500 - Installation Details; Operator Dimensions

Default Icon
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
2.
W
IRING
R
EQUIREMENTS
- The operator can be connected to a suitable 240v a.c 10A power circuit provided it is done so by a
licensed person and rules in AS/NZS 3000:2007 are adhered to.
- Solar power can be used to power the operator instead of connecting 240v. This unit can be supplied set
up for use with solar power, or by removing the 240vac transformer and following wiring set up for solar
connection.
- The power supply transformer can be removed and installed in an IP rated enclosure and mounted away
from the gate operator. This is done sometimes where mains power is not available or it is impractical to
run mains power to the site. The operator can be supplied with a separate power supply upon special order.
Then all that is run to the operator is 2 x 2.5mm wires to carry 16vac (extra low voltage).
3.
I
NSTALLATION
D
ETAILS
Operator Dimensions

Related product manuals