EasyManuals Logo

GE AK-50 User Manual

GE AK-50
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
Low
-
voltage
Power
Circuit
Breakers
GEI
-
74600
f
BASIC
BREAKER
COMPONENTS
1
DISASSEMBLY
AK
AND
AKF
CENTER
POLE
(
Fig
.
4
)
REPLACEMENT
AKF
BREAKERS
ARC
QUENCHERS
(
Fig
*
4
and
5
)
The
center
-
pole
arc
quencher
of
these
breakers
is
similar
to
the
arc
The
following
instructions
apply
to
quenchers
of
the
standard
breakers
and
both
the
Type
AK
and
AKF
breaker
is
replaced
in
a
similar
manner
,
except
center
poles
,
that
the
breaker
must
be
closed
.
With
The
arc
quenchers
should
be
in
-
spected
at
the
regular
inspection
period
.
If
the
barriers
are
cracked
or
eroded
to
one
-
half
their
original
thickness
,
they
should
be
replaced
.
1
.
Remove
arc
quenchers
(
see
the
breaker
closed
the
center
-
pole
contacts
are
open
and
the
arc
quencher
REPLACEMENT
)
,
can
be
removed
.
r
REPLACEMENT
AK
BREAKERS
2
.
Remove
screws
holding
spacer
block
(
9
)
.
Replace
the
outer
-
pole
arc
quen
-
chers
of
the
Type
AKF
breaker
as
follows
;
1
.
Be
sure
the
breaker
is
open
.
3
.
Remove
spacer
block
,
steel
back
plate
(
8
)
,
and
compound
support
(
7
)
.
2
Remove
the
channel
-
shaped
re
-
taining
bar
by
removing
two
screws
and
two
nuts
.
4
.
Rock
muffler
(
6
)
slightly
and
re
-
move
.
The
inner
barriers
(
5
)
can
now
2
.
Remove
the
two
channel
-
shaped
be
removed
for
inspection
,
retaining
bars
which
bear
against
the
front
of
the
arc
quencher
by
removing
four
screws
,
two
on
each
side
.
1
.
Be
sure
the
breaker
is
open
.
3
.
Lift
the
quenchers
clear
of
the
movable
arcing
contacts
.
5
.
Remove
nut
and
withdraw
stud
(
1
)
.
6
.
Remove
cap
(
2
)
.
The
side
(
3
)
and
pocket
(
4
)
barriers
should
be
free
.
4
.
During
replacement
be
careful
not
to
overtighten
the
screws
which
se
-
cure
the
channel
-
shaped
retainingbar
.
Overtightening
the
screws
will
bow
the
bar
and
leave
the
center
arc
quen
-
cher
loose
.
3
.
Lift
the
arc
quenchers
clear
of
the
movable
arcing
contacts
.
7
.
Reassemble
and
replace
the
arc
quencher
in
the
reverse
order
.
Tighten
the
fastenings
after
replacement
.
4
.
Replace
arc
quenchers
and
in
-
sert
the
four
screws
holding
the
re
-
taining
bars
in
position
.
c
©
CO
©
CO
-
A
*
-
V
*
V
*
>
.
r
v
.
.
it
-
Y
~
.
»
i
.
I
2
3
4
5
6
7
9
8
?
.
Compound
Support
8
.
Steel
Back
Plate
9
.
Spacer
Block
4
.
Pocket
Barrier
5
.
Inner
Barrier
6
.
Muffler
1
.
Stud
2
.
Cap
3
.
Side
Barrier
W
Courtesy of NationalSwitchgear.com

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AK-50 and is the answer not in the manual?

GE AK-50 Specifications

General IconGeneral
BrandGE
ModelAK-50
CategoryCircuit breakers
LanguageEnglish

Related product manuals