General handling, safety, and precautions for the UPS.
Safety requirements and warnings for UPS installation.
Guidelines for safe storage and handling of the UPS and batteries.
Description of the standard Voltage Frequency Independent operation mode.
How the UPS operates during mains power failure and recovery.
Functionality and use of automatic and manual bypass systems.
How to connect the UPS to the mains power supply.
Guidance on overcurrent protection and cable sizing for UPS.
Terminal connections for power input, output, and battery.
Step-by-step instructions for operating a single SitePro UPS.
Step-by-step guide for the initial power-up of a single UPS.
Setting essential configuration parameters during the initial UPS start-up.
Detailed steps to start up a single SitePro UPS unit.
Procedure for safely shutting down a single UPS with load transfer.
Steps to return the UPS to normal VFI operation from manual bypass.
Steps for a full power-down of the UPS system.
How to resume normal operation after activating the "Load Off" command.
Instructions for operating SitePro UPS units in a parallel system.
Step-by-step guide for powering up a SitePro parallel UPS system.
Procedure for shutting down a parallel UPS system via manual bypass.
Steps to return a parallel system to normal VFI operation from bypass.
Procedure for a full power-down of the entire parallel UPS system.
How to resume normal operation for a parallel system after "Load Off".
How to connect and use the Emergency Power Off function.
General guidelines and recommendations for UPS preventive maintenance.
Guidelines for battery testing, charging, and maintenance.