Do you have a question about the GE Digital Energy SitePro 15 kVA and is the answer not in the manual?
General precautions for handling, installation, storage, and battery safety.
Specific safety measures and PPE required when working with UPS batteries.
Describes UPS behavior during mains power failure and recovery phases.
Introduction to SitePro's Redundant Parallel Architecture (RPA).
Requirements for UPS location, ventilation, cooling, and battery placement.
Guidelines for mains input connection, overcurrent protection, and wire sizing.
Details on UPS power connections, AC input selection, and frequency converter use.
Instructions for power and control bus wiring for RPA parallel systems.
Navigating alarms, events, and messages lists for troubleshooting.
Step-by-step guide for initial start-up and configuration of a single UPS.
Procedures for shutting down and restoring a single UPS unit.
Guide for initial start-up and configuration of a SitePro Parallel System.
Procedures for shutting down and restoring a parallel UPS system.
Connecting EPO switches and generator status signals.