EasyManua.ls Logo

GE Digital Energy SitePro 20 kVA User Manual

GE Digital Energy SitePro 20 kVA
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GE Digital Energy
Power Quality
S
P
_
0
1
0
-
0
4
0
_
S
8
_
U
P
S
_
G
E
_
0
1
Operating Manual
Uninterruptible Power supply
Digital Energy™
SitePro
10 – 15 – 20 – 30 – 40 kVA
400 Vac CE / Series 8
GE Consumer & Industrial SA
General Electric Company
CH – 6595 Riazzino (Locarno)
Switzerland
T +41 (0)91 / 850 51 51
F +41 (0)91 / 850 51 44
www.gedigitalenergy.com
GE imagination at work

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the GE Digital Energy SitePro 20 kVA and is the answer not in the manual?

GE Digital Energy SitePro 20 kVA Specifications

General IconGeneral
BrandGE
ModelDigital Energy SitePro 20 kVA
CategoryUPS
LanguageEnglish

Summary

SAFETY RULES

General Safety Guidelines

General safety instructions for UPS handling, installation, and operation.

Battery Safety

Specific safety instructions for handling and working with batteries.

Safety Symbols and Warnings

Explanation of warning symbols used throughout the manual.

DESCRIPTION

PARALLEL SYSTEM OPERATION

SERVICE AND TECHNICAL SUPPORT

WARRANTY

INSTALLATION

Place of Installation

Requirements for UPS location, clearance, and ventilation.

Battery Location

Requirements for safe and optimal battery placement.

ELECTRICAL WIRING

Mains Input Connection

Procedures for connecting the UPS to the mains power supply.

Over Current Protection and Wire Sizing

Guidelines for selecting fuses, breakers, and cable sizes.

Installation Requirements

Specific requirements for electrical installation and connections.

ELECTRICAL CONNECTION

Power Connections

Detailed information on connecting power input, output, and battery terminals.

RPA PARALLEL SYSTEM CONNECTION

Power Wiring for Parallel Units

Guidelines for power cable routing and connection in parallel systems.

Parallel Control Bus Connection

Connecting the control bus for communication between parallel UPS units.

CONTROL PANEL

LCD SCREEN

OPERATION

Single UPS Procedures

Covers start-up, shutdown, and commissioning for single UPS units.

Single UPS Start-up and Commissioning

Step-by-step initial start-up and configuration for a single UPS.

Single UPS Shutdown and Restart

Procedures for shutting down and restoring single UPS operation.

Restoring Single UPS to Normal VFI Operation

Returning the UPS to normal VFI mode from manual bypass.

Complete Single UPS Shutdown

Steps for a full shutdown of a single UPS system.

Parallel UPS Procedures

Covers start-up, shutdown, and management of parallel UPS systems.

Parallel UPS Start-up and Commissioning

Step-by-step start-up and configuration for parallel UPS systems.

UPS Configuration and Commissioning

Setting up UPS parameters and completing the initial commissioning process.

CUSTOMER INTERFACE

OPTIONS

MAINTENANCE

Preventive Maintenance Overview

General recommendations for UPS periodic maintenance and service checks.

Related product manuals