EasyManua.ls Logo

GE UUC112WC Series - Final Checks and Customer Handover

GE UUC112WC Series
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31-5000483 Rev. 3 17
Final Check
System Test
Please explain to the customer how to operate the system by
using the Owner’s Manual found with the indoor unit.
Check Items for Test Run
No gas leak from linesets?
Are the linesets insulated properly?
Are the connecting wirings of indoor and outdoor firmly
inserted to the terminal block?
Is the connecting wiring of indoor and outdoor fixed?
Is condensate draining correctly?
Is the ground wire securely connected? Is the indoor unit
securely fixed?
Is power source voltage correct according to local code?
Is there any odd noise?
Does the cooling temperature drop between 20-30°F?
Is the room temperature display accurate?
Explaining Operation To the End User
Using the User Manual, explain to the user how to use
the air conditioner (thermostat, adding/removing the air
filters, cleaning methods, precautions for operation, etc.)
Review precautions for operation.
Recommend that the user read the Operating Instructions
carefully.
INSTALLATION INSTRUCTIONS

Other manuals for GE UUC112WC Series

Related product manuals