I
INSTALLATION INSTRUCTIONS
(cont,nue,)
I
NEWDUCTEDINSmLLAVON
If
this unit is to be installed in a new ducted
application using a duct adaptor kit, the kit must
be installed before the chassis is placed in the wall
case. The Installation Instructions are packed with
the kit.
MISVNGDUCTEDINSWILAVON
Replacement of an existing ducted unit may require
different components. Request this information
from your sales representative.
I
INSMLLATION
1. Remove the room cabinet by pulling out at the
bottom to release it, then lift it up to clear the rail
along the chassis top.
2.
Slide the chassis into the wall case and secure
with four screws through the chassis flange holes.
Case
lNS~LLATION
(continued)
3. Reinstall the room cabinet by hooking the top
over the rail along the chassis top, then pushing it
in at the bottom.
POWER
CONNECVON
The power connection kit must be used to supply
power to the
Zoneline chassis. The appropriate kit
is determined by the voltage, the means of
electrical connection and the amperage of the
branch circuit.
Connections of 208 or 230 volt circuits maybe
with a line cord kit or a permanent connection kit.
Connections of 265 volt circuits must be with a
permanent connection kit.
Electrical Wiring Wall
Outlets 230/208 volt
Tandem 15 amp
o
●
:
Perpendicular 20 amp
o
.:
Lsrge
tandem 30 amp
o
.:
&
PERMANENT
%
CONNECTION KIT
NEC requires permanent connection for
installations over 250 volts.
All wiring, including installation of the receptacle,
must be in accordance with the National Electrical
Code and local codes, ordinances and regulations.
(continued next page)
7