EasyManuals Logo

geminox THR 2-13 M75 User Manual

geminox THR 2-13 M75
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image

,167$//$7,21
 (YDFXDWLRQXVLQJEDODQFHGIOXH
*HQHUDOLQVWUXFWLRQV
The sealed combustion circuit THR boiler connec-
ted to a vertical or horizontal balanced flue is inde-
pendent of the ventilation conditions in the room
where it is installed. A horizontal balanced flue must
be installed when the wall adjoining the water heater
gives onto the outside in a well ventilated location.
Two concentric tubes supply air to the burner and
evacuate the combustion products. The conduits
can be bent, allowing the system to be adapted to
most installation situations.
The flue terminal cover is specially designed to
withstand wind from all directions as well as rain and
snow.
([DPSOHDVVHPEO\
HORIZONTAL BALANCED FLUE INSTALLATION
VERTICAL BALANCED FLUE INSTALLATION
)LJ

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the geminox THR 2-13 M75 and is the answer not in the manual?

geminox THR 2-13 M75 Specifications

General IconGeneral
Brandgeminox
ModelTHR 2-13 M75
CategoryBoiler
LanguageEnglish

Related product manuals