Do you have a question about the geminox MERITE ZEM 5-25 C and is the answer not in the manual?
Detailed safety instructions covering gas, flue gas, materials, fitting, servicing, and air.
Procedure for safety test, regulator shutdown, and how to disable these functions.
Covers installer qualifications, compliance with regulations, and suitability of installation location.
Detailed guidance on flue systems, materials, and installation procedures.
Recommendations for hydraulic connections, including bleed, safety control box, and expansion vessels.
Instructions for connecting the gas supply, including stopcocks and pipe flushing.
Guidance on mains connection and connecting sensors to the LMU management unit.
Details on Bionibal and Bionibagel products for corrosion inhibition and antifreeze protection.
Procedure for filling the boiler and heating system with water, including bleeding and pressure checks.
Instructions for opening the gas cock, bleeding gas piping, and checking for leaks.
Checklist of essential verifications before initiating boiler operation.
Detailed steps for commissioning, including mode selection and sensor connections.
Instructions for qualified personnel on changing the boiler's gas type, with safety warnings.
Guidance on ordering and performing the conversion from natural gas to propane.
Procedure for controlling gas flow, pressure, and emissions using specific valves and tools.
Instructions for disassembling, cleaning, and reassembling the fan and burner unit.
List of boiler display codes, their descriptions, and recommended solutions for faults.
List of items and conditions not covered by the manufacturer's warranty.