EasyManuals Logo

Generac Power Systems 37kW NG User Manual

Generac Power Systems 37kW NG
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
Generac
®
Power Systems, Inc. 21
Section 4 — Maintenance
QUIETSOURCE
40kW Liquid-cooled Generators
Maintenance Level 1 Level 2 Level 3 Level 4
Tasks
Recom- Task Required Task Required Task Task
mended Comp. to be done Comp. to be done Comp. Required Comp.
to be done (Date- 3 months/ (Date- Semi- (Date- to be done (Date-
monthly Initials) Break-in Initials) annually Initials) Annually Initials)
13. Initiate an automatic start
and transfer of the unit to
site load and exercise it for
at least 1 hour looking for
leaks, loose connections
or components, and
abnormal operating
conditions. Correct as
necessary.
14. Start and exercise the unit
at full rated load (use a
load bank if the site load is
not enough) for at least 2
hours looking for leaks,
loose connections or
components, and abnormal
operating conditions.
Correct as necessary.
15. Change the engine oil.
16. Replace the engine oil
filter(s).
17. Replace the engine air
filter(s).
18. Replace the engine fuel
filter(s) on diesel engine
driven units and re-prime
the fuel system.
19. Check the engine spark
plugs on gas engine driven
units. Clean and re-gap or
replace as necessary.
20. Perform a 5 minute no-load
operational run of the unit
looking for any post service
problems.
21. Return the unit to standby
setup for operation when
required.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Generac Power Systems 37kW NG and is the answer not in the manual?

Generac Power Systems 37kW NG Specifications

General IconGeneral
BrandGenerac Power Systems
Model37kW NG
CategoryInverter
LanguageEnglish

Related product manuals