EasyManua.ls Logo

Generac Power Systems H-100

Generac Power Systems H-100
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Select the time of day to run exercise.
Verify “QuietTest®” is not checked. Press “Apply”.
Setup of Normal exercise is now complete. For this
example, exercise will start every Wednesday at 10:30
AM and run until about 10:50 AM
If exercise of the HTS is desired, Click on “Transfer
on exercise” to enable transferring of the load to the
generator during exercise.
NOTE:
This feature is only available in non-QuietTest®
exercise and when an HTS is in the system.
QUIETTEST
®
SETUP USING FRONT
PANEL
Press the “MENU” button.
Move the cursor using the arrow keys to the Exercise/
HTS menu item.
Press the “ENTER” button.
Move the cursor to the “Exercise Enabled” field on
the first line.
Press the “ENTER” button to enter edit mode.
General Information
H-100 Control Panel Technical Manual

Table of Contents

Related product manuals