SERVICE SCHEDULE
22 KW - 150 KW GASEOUS STATIONARY EMERGENCY GENERATOR
The following is a recommended maintenance schedule for Gaseous Stationary Emergency Generator sets from 22kW to 150 kW in size. The
established intervals in the schedule are the maximum recommended when the unit is used in an average service application. They will need
to be decreased (performed more frequently) if the unit is used in a severe application. Use calendar time, from the previous maintenance
interval to determine the next required maintenance interval.
Service Maintenance Interval Information:
The various service maintenance intervals are designated by interval numbers as follows:
1 An early inspection of the generator set to insure it is ready to operate when required and to identify any potential problem areas.
This inspection may be performed by the end user providing the following safety steps are taken to prevent the engine from starting
automatically without warning:
To prevent injury, perform the following steps in the order indicated before starting any maintenance:
Disable the generator set from starting and/or connecting to the load by setting the control panel Auto/Off/Manual switch to the
“OFF” position.
Remove the 15 amp control panel fuse.
Turn off the battery charger.*
Remove the negative battery cable.
* The battery charger must be turned off BEFORE removing the battery cable to prevent an over current condition from burning out
sensitive control panel components and circuits.
Following all maintenance, reverse these steps to insure the unit is returned to standby setup for normal operation when required.
2 A wear-in service inspection of the generator set to insure it is ready to operate and carry the load when required, and to identify any
potential problem areas.
Performed ONLY ONCE following the first three months or the first 30 hours of operation after purchase of the unit.
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be
performed only by a Service Dealer.
3 An operational inspection of the generator set to insure it is ready to operate and carry the load when required, and to identify any potential
problem areas.
Performed semi-annually or following each 50 hours of operation of the unit.
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be
performed only by a Service Dealer.
4 A mid-level inspection of the generator set to insure it is ready to operate and carry the load when required, and to identify any potential
problem areas.
Performed annually or following each 100 hours of operation of the unit.
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be
performed only by a Service Dealer.
5 A comprehensive inspection of the generator set to insure it is properly serviced and ready to operate and carry the load when required,
and to identify any potential problem areas.
Performed annually or following each 250 hours of operation of the unit.
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be
performed only by a Service Dealer.
11-1
SrvSchd001 Rev. G 06/10
Service Schedule

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Generac Power Systems QT06030GNSN and is the answer not in the manual?

Generac Power Systems QT06030GNSN Specifications

General IconGeneral
BrandGenerac Power Systems
ModelQT06030GNSN
CategoryPortable Generator
LanguageEnglish

Related product manuals