EasyManua.ls Logo

Genesis GV60 - Page 6

Genesis GV60
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Immobilization / stabilization / lifting
4
Extrication Operations
The extrication operations for the Electrified GV60 are similar to a conventional
vehicle. However, first responders should pay special attention when they extract
occupants in the vehicle. Before extrication operations, the first responders should
carry out “Initial Response: Identify, Immobilize and Disable” procedure section in
page 5 to 8.
Vehicle Stabilization
Use standard stabilization (cribbing) points, as shown. Always be sure to connect
to a structural member of the vehicle and avoid placing cribbing under high
voltage cables, fuel lines and other areas not normally considered acceptable.
* The actual image of vehicle may differ from the illustration

Other manuals for Genesis GV60

Related product manuals