EasyManua.ls Logo

Gin Yeti UL - Preflight Checks and Service; Preflight Inspection Procedure; GIN Quality and Customer Service

Gin Yeti UL
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Yeti UL front container manual: 17
Preflight check
The deployment handle and its strap must be connected to the deployment bag of the
parachute. In particular, check the length of the strap connecting the rescue deployment
handle to the rescue inner container. It should be long enough that the reserve can be
extracted without the danger of the pins not being pulled before the strap tightens on the
reserve, but not so long that there is excessive slack that extends the movement required
for deployment.
IMPORTANT: After you have finished packing the Yeti UL front container, you must do a test
deployment to ensure that it can be deployed correctly.
IMPORTANT: Make sure that both rescue bridles are connected with a main carabiner
on each side.
GIN quality and service
We take pride in the quality of our products and are committed to putting right any
problems affecting the safety or function of your equipment and which are attributable to
manufacturing faults. Your GIN dealer is your first point of contact if you have any problems