EasyManua.ls Logo

Glen Dimplex Combi 38 - Comfort Mode; Central Heating Display; Domestic Hot Water Display; Re-pressurising the System

Glen Dimplex Combi 38
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.0 INTRODUCTION
1.1 BUILDING REGULATIONS AND BENCHMARK CHECKLIST
Building Regulations (England & Wales) require notification of
the installation of a heating appliance to the relevant Local
Authority Building Control Department.
From 1 April 2005 this can be achieved via a Competent
Persons Self Certification Scheme as an option to notifying the
Local Authority directly.
CORGI operates a Self Certification Scheme for gas heating
appliances.
With the introduction of Self Certification Schemes, the
Benchmark Logbook is being withdrawn. However, a similar
document in the form of a commissioning checklist and service
interval record is incorporated at the back of these
instructions.
This company is a member of the Benchmark initiative and
fully supports the aims of the programme. Its aim is to
improve the standards of installation and commissioning of
central heating systems in the UK and to encourage the regular
servicing of all central heating systems to ensure safety and
efficiency.
Building Regulations require that installations should comply
with manufacturer’s instructions. It is therefore important that
the commissioning checklist is completed by the installer. The
relevant section of Building Regulations only relates to
dwellings. Therefore the checklist only applies if the appliance
is being installed in a dwelling or some related structure.
4
© Dimplex Boilers 2008
1.2 INSTALLATION, COMMISSIONING, SERVICE & REPAIR
This appliance must be installed in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.
In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.
Definition of competence:
A person who works for a CORGI
registered company and holding current certificates in the
relevant ACS modules, is deemed competent.
In IE, this must be carried out by a competent person as stated
in I.S. 813 “Domestic Gas Installations”
No modifications or changes can be made to this appliance
without prior written permission from Dimplex Boilers.
The manufacturers instructions must not be taken as overriding
any statutory requirements. If in doubt contact Dimplex Boilers
on 0844 3711121.
Warning -
Check the information on the data plate is
compatible with local supply conditions.
All CORGI registered installers carry a CORGI identification card
and have a registration number. You can check your installer is
registered by telephoning 0870 4012300 or writing to:-
1 Elmwood
Chineham Business Park
Crockford Lane
Basingstoke
RG24 8WG
or check online at www.corgi-gas-safety.com
These appliances meet the requirements of;
Gas Appliance Directive 90/396/EEC
Efficiency of Hot Water Boilers Directive 92/42/EEC
Low Voltage Directive 92/42/EEC
Electromagnetic Compatibility Directive 92/31/EEC
Type test certified by:- Notified Body 0087 (Pin 87BT49).
Product/Production certified by:
Notified Body 0086.
For GB/IE only
17.0 BENCHMARK
© Dimplex Boilers 2008
45
MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST
*
llA installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certificate will then be issued to the customer.
©Heating and Hotwater Industry Council (HHIC) www.centralheating.co.uk
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only)
Is the primary circuit a sealed or open vented system? Sealed
Open
What is the maximum primary flow temperature?
°C
ALL SYSTEMS
What is the incoming static cold water pressure at the inlet to the system? bar
Has a strainer been cleaned of installation debris (if fitted)? Ye s
No
Is the installation in a hard water area (above 200ppm)? Ye s
No
If yes, has a water scale reducer been fitted? Ye s
No
What type of scale reducer has been fitted?
What is the hot water thermostat set temperature?
°C
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)?
l/min
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations? Yes
Type of control system (if applicable) Y Plan
S Plan Other
Is the cylinder solar (or other renewable) compatible? Ye s
No
What is the hot water temperature at the nearest outlet? °C
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed Yes
UNVENTED SYSTEMS ONLY
Where is the pressure reducing valve situated (if fitted)?
What is the pressure reducing valve setting?
bar
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested? Yes No
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes
Are all energy sources fitted with a cut out device? Ye s
No
Has the expansion vessel or internal air space been checked? Ye s
No
THERMAL STORES ONLY
What store temperature is achievable? °C
What is the maximum hot water temperature?
°C
ALL INSTALLATIONS
The hot water system complies with the appropriate Building Regulations Ye s
The system has been installed and commissioned in accordance with the manufacturer’s instructions Yes
The system controls have been demonstrated to and understood by the customer Ye s
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
Customer Name Telephone Number
Address
Cylinder Make and Model
Cylinder Serial Number
Commissioned by
(print name) Registered Operative ID Number
Company Name Telephone Number
Company Address
Commissioning Date
To be completed by the customer on receipt of a Building Regulations Compliance Certificate
*
:
Building Regulations Notification Number (if applicable)
48pp MANUAL SPREADS 19/10/10 08:36 Page 4

Other manuals for Glen Dimplex Combi 38

Related product manuals