EasyManua.ls Logo

Glow-worm Betacom 4 - Final Checks and Product Decommissioning

Glow-worm Betacom 4
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
0020238424_04 Betacom 4 Installation and maintenance instructions 39
2. Remove the volume flow sensor (1).
3. Install the new volume flow sensor.
4. Plug in the plug.
13.6.11 Replace the pressure sensor
1
2
1. Pull out the plug.
2. Remove the clip (1).
3. Remove the pressure sensor (2).
4. Install the new pressure sensor.
5. Reattach the clip
(1).
13.7 Checking the product for leak-tightness
Check that the product is leak-tight. ( Page 29)
14 Decommissioning the product
Decommission the product.
Disconnect the product from the power grid.
Close the gas stopcock.
Close the cold-water stopcock.
Drain the product. ( Page 35)
15 Recycling and disposal
Disposing of the packaging
Dispose of the packaging correctly.
Observe all relevant regulations.
For detailed information refer to www.vaillant.co.uk.

Table of Contents

Related product manuals