EasyManuals Logo

Glow-worm Ultracom2 sxi Instructions For Use Installation And Servicing

Glow-worm Ultracom2 sxi
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
17 0020008155A
Diagram 6.1
6.1 Appliance Pack
IMPORTANT: With regards to the Health and Safety Manual
Handling requirements, two persons shall be required to lift the
appliance, refer to manual handling on page 5.
Please check the contents of packs as shown in diagram 6.1.
NOTE: The fixing pack is located in the base polystyrene
packing under the boiler base.
Remove the polystyrene end packing pieces then carefully lay
the boiler on its back, remove the two front casing panel
securing screws and lift off the panel from two retaining lugs.
Remove the transit packaging behind the front panel and
discard.
Carefully place front panel and screws to one side.
6 Installation Preparation
12346

Other manuals for Glow-worm Ultracom2 sxi

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm Ultracom2 sxi and is the answer not in the manual?

Glow-worm Ultracom2 sxi Specifications

General IconGeneral
BrandGlow-worm
ModelUltracom2 sxi
CategoryBoiler
LanguageEnglish

Related product manuals