GREE                                                                        GMV5E DC INVERTER VRF UNITS SERVICE MANUAL 
    259   
Step 7: Preparations.   
1. Prepare new parts.   
In the course of moving compressors, do not lay them down or put them upside down. The tilt angle 
should be less than 30°. Make sure oil will not overflow from the oil balance opening. The inlet and outlet 
should be blocked. If the sealing rubber is not available, cover them with tape to prevent direct contact of 
oil and air.   
 
Note:
 The new compressor must be consistent with the faulty one in model.   
Prevention against electric shock
Turn power off before servicing. Use this compressor on a grounded system only. 
Warning
AND-NOT
Prohibition
DO NOT put flammable or explosive gas into the compressor.