EasyManua.ls Logo

Gree GRS-CP11Pd/NhA-K - Unit Installation Requirements; Water System Connection

Gree GRS-CP11Pd/NhA-K
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Heat Pump Pool Heater
12
3.4 Unit Installation Requirements
(1) Ensure that the sound and air flow of unit operation will not affect others or
animals and plants.
(2) Ensure that the unit has good ventilation. If a canopy is installed to protect the
unit, the heat dissipation and absorption shall not be affected.
(3) The unit shall be installed at a place with a solid foundation. The unit shall be
installed vertically more than 15 cm above the horizontal ground, and shall be
fully firmly installed with the impact of strong wind, typhoon and earthquake
fully considered.
(4) Clip the unit drain joint into the drain hole in the middle of the base plate to
ensure reliable connection, then connect the drain pipe to the drain joint and
lead the drain pipe to a proper place for drainage.
Fig. 3.4-1 Drainage pipe connection
3.5 Water System Connection
3.5.1 Installation Requirements of Water System Piping
(1) The design and construction of the water system must meet the requirements
of the local plumbing design specifications and relevant standards.
(2) For an appliance intended to be permanently connected to the water mains
and not connected by a hose set.
(3) The water pipe connecting parts must be sealed with raw tape to prevent
water leakage.
(4) The water inlet and outlet connection parts of each pipeline shall be pasted
with water inlet and outlet signs to avoid connection errors.

Related product manuals