EasyManua.ls Logo

Gree GUD24W2/D-D(U) - Page 108

Gree GUD24W2/D-D(U)
141 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE DC INVERTER HEAT PUMP CONDENSING UNIT SERVICE MANUAL
105
Removal of Electronic Expansion Valve
Removing the electronic expansion valve, make sure there is no refrigerant in the pipeline and power is cut off.
Step Picture Work Instruction
6. Secure the
electric box and
arrange the wires
as required.
Put the electric box back in
place and tighten up the
screws.
Arrange the wires as original.
7. Check and open
the upper and
front panels.
Check whether each
component and connection
wire is well connected.
If everything is OK, install the
upper, left and right panels.
Tighten up the screws.

Related product manuals