GREE U-Match 6 SERIES UNIT SERVICE MANUAL
89
Caution!
Make sure the lubricant is sealed inside the compressors.
(2) Prepare relevant tools
1) Prepare nitrogen. Please strictly follow the nitrogen welding standards during the welding
process. Make sure there is sufficient nitrogen. The nitrogen pressure should be above
2.0MPa;
2) Prepare welding rods. Prepare some welding rods of common specifications and some
special welding rods that contain more than 5% silver. They are used to weld the
compressor. The suction and exhaust openings of the compressor are all connected to
copper-plated steel pipes, so we need to use special welding rods and solder;
3) Prepare applicable welding tools. Please evaluate how much oxygen and acetylene should
be used according to the current welding condition. Try to avoid repeated welding.
4) Prepare a complete set of tools, including an internal hexagonal wrench, diagonal pliers,
pincer pliers, nipper pliers, a universal meter, a pressure gauge, cross screwdriver, straight
screwdriver, more than two wrenches, insulating tape and wire cables.
Step 2: Disconnect power
If the compressor needs to be replaced after judging as above, then switch off the outdoor unit and
disconnect the power cable of the outdoor unit. Use insulating tape to wrap the power cable and put a
notice board on the power switch to remind people to be cautious of electric shock.
Step 3: Neaten the electric components
When you detach the compressor wires, temperature sensors and electric heaters, mark them
correspondingly for the convenience of reconnecting them.
Step 4: Discharge refrigerant
Discharge refrigerant from the system. Discharge simultaneously from the high pressure side and low
pressure side. Do not discharge too fast (It should take more than 12h to completely discharge the
refrigerant); otherwise, large quantity of lubricant will escape from the system together with the refrigerant.
Step 5: Detach the compressor
WARNING
(1) The area shall be checked with an appropriate refrigerant detector prior to and during work, to ensure the technician is
aware of potentially flammable atmospheres. Ensure that the leak detection equipment being used is suitable for use
with flammable refrigerants, i.e. non-sparking, adequately sealed or intrinsically safe.
(2) Under no circumstances shall potential sources of ignition be used in the searching for or detection of refrigerant
leaks. A halide torch (or any other detector using a naked flame) shall not be used.