EasyManua.ls Logo

Gree GVH24AK-K3DNC6A - Page 55

Gree GVH24AK-K3DNC6A
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52
Installation and Maintenance
Service Manual
Ambient temperature
sensor and tube
temperature sensor
should through this
position and then
connect to the mainboard
Wring connection in
wiring board is shown
as the figure. Ground lead
of motor and mainboard
are fixed beside the wiring
board, as shown in the figure.
The motor wire should
through from the wire slots
shown in the picture and
then connect to the mainboard.
The 2-way valve and electronic
expansion valve should be
arranged as shown in the
picture, the wires should be
clicked into the buckles in the
bottom of electric box.
All the wires in this position
should be fixed with tieline,
(truss the excess part of wires
of 2-way valve and electronic
expansion valve), and then
arrange the wires from the
lower buckle of electric box to
enter into the electric box.
Wire arrangement
inside the electric
box for wires
of ambient
temperature
sensor and
tube temperature
sensor, electronic
expansion valve,
2-wayvalve is
shown in the
picture.
,
n the lower position of sound
insulation cotton, use high-temperature
tieline to truss the temperature sensor
wire, compressor wire, overload wire,
4-way valve wire, etc. to prevent
them from touching the inhalation
tube. (Notes: all the wires should
thread through the wire hole of inner
side of sound insulation cotton)
Air discharge wire, 4-way valve wire,
compressor wire and overload wire
are all belonging to motion wires.
When fixing the wires, keep a
clearance of 20~30 mm to prevent
them from being dragged.

Other manuals for Gree GVH24AK-K3DNC6A

Related product manuals