8.
2.
4.
5.
Selection of installation location
Requirements for electric connection
3.
air emitted by the outdoor unit will not affect
Outdoor unit
1.Select a location where the noise and outflow
Air switch capacity
neighborhood.
2.
The location should be well ventilated and dry,
Select a location which is out of reach for chil-
in which the outdoor unit won't be exposed dir-
ectly to sunlight or strong wind.
3.
4.
Basic requirement
Installing the unit in the following places may cau-
se malfunction. If it is unavoidable, please consu-
lt the local dealer:
5.
6.
7.
laundry.
5.
2.
Safety precaution
dren and far away from animals or plants. If it
is unavoidable, please add the fence for safety
purpose.
It’s not allowed to be installed on 
the unstable
or motive base structure 
(such as truck) or in
the corrosive environ
ment (such as chemical
factory).
1.
2.
3.
The location should be able to withstand the
Grounding requirement
uirement of installation dimension diagram.
Must follow the electric safety regulations w-
 hen installing the unit.
According to the local safety regulations,use
An all-pole disconnection switch having a co-
ntact separation of at least 3mm in all poles
should be connected in fixed wiring.
The yellow-green wire in air  conditioner is
grounding wire, which can 't be used for other
purposes.
The grounding resistance should  comply with
weight of outdoor unit.
4.
Make sure that the installation follows the req-
1.
The place with sulfureted gas.
Other places with special circumstances.
The appliance shall not be installed in the
The place with strong hea t sources, vapors,
flammable or explosive gas, or volatile objects
spread in the air.
The place with high-frequen cy devices (such
as welding machine, medical equipment).
The place near coast area.
The place with oil or fumes in the air.
8.
The temperature of refrigerant circuit will be hi-
with national wiring regulations.
Air-conditioner
Air switch capacity
07K、09K
GWH12QC-K6DNA1C/O
GWH12YC-K6DNA1A/O
GWH12YC-K6DNA1Z/O
12K、18K
GWH09YD-S6DBA2A/O
GWH09ACC-S6DBA1A/O
GWH09UB-K6DNA4A/O
GWH18YE-S6DBA2A/O
GWH18ACE-S6DBA1A/O
10A
16A
GWH12QB-K6DNB4Y/O 13A
24K
25A
from the copper tube.
9.
The appliance shall be installed in accordance
1.
T
he air conditioner is  the first class 
electric
national electric safety regulations.
The appliance must be positioned so tha t the
p
 
l
 
u
 
g is accessible.
6.Do not put through the power before finishing
installation.
7.
If the supply cord is damaged, it must 
be repla-
appliance.It must be properly 
grounding with
specialized grounding
 
device by a professional.
Please make 
sure it is always grounded effecti-
vely, otherwise it may cause electric shock.
gh, please keep the interconnection cable away
4.Properly connect the live wire, neutral wire and
ced by the manufacturer, its 
service agent or
similarly qualified
 persons in order to avoid a
hazard .
qualified power supply circuit and air switch.
3.Make sure the power supply matches with the
7
requirement of air conditioner.
 
Unstable power
supply or incorrect  wiring or malfunction. Pl-
ease install proper power supply cables before
using the air 
conditioner.
grounding wire of power socket.
5.
Be sure to cut off the power supply 
before pr-
Including an air switch with suitable capacity,
please note the following table . Air switch sh-
ould be included magne t buckle and heating
buckle function, it can protec t the circuit-short
and overload. (Caution: please do no t use the
fuse only for protect the circuit)
oceeding any work related to 
electricity and safety.