EasyManua.ls Logo

Gree GWH12QD-S6DBD6A/I

Gree GWH12QD-S6DBD6A/I
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
108
Installation and Maintenance
Service Manual
Remove screws fixing electric box assy and
mid-isolation board, loosen the bonding tie, pull off the
wiring terminal, lift to remove the electric box assy.
9. Remove electric box assy
10. Remove four-way valve assy
11. Remove electron expansion valve
electric boxassy
cover
electric box
four-way valve ass
electron expansion valve
y
We
Unsolder the spot weld of discharge and inhalation
tube sub-assy, electronic expansion valve,compressor
and condenser, and then remove the discharge and
inhalation tube sub-assy and electronic expansion valve.
lding cut the spot weld of four-way valve assy,
compressor air suction/discharging valve and
condenser pipe outlet, lift to remove the four-way valve
assy. (Note: release the refrigerant before welding
cutting.)

Table of Contents

Related product manuals