EasyManua.ls Logo

Gree GWH18QD-K3DNB6G - Page 108

Gree GWH18QD-K3DNB6G
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
105
Installation and Maintenance
Service Manual
(1)
(2)
Terminal of
compressor
overload
protection
Terminal of
temperature
sensor
Terminal of
4-way valve
Terminal of
outdoor fan
Terminal of
compressor wire
PFC induction
wire
grounding wire
circlip
retainer
high and low
pressure switch
Remove the nut xing axial ow blade and then
remove the blade.
Remove the grounding wire screw on the
electric box assy and then remove the
grounding wire. (See g 1)
a
c
b
Disconnect the wiring terminals of reactor,
compressor, high and low pressure switch,
compressor overload protector, temperature
sensor, outdoor fan motor and 4-way valve. (See
g 2)
Note: keep pressing the circlip when
disconnecting the wiring terminal of reactor;
keep pressing the retainer when disconnecting
other wiring terminals.
Remove the wire inside the wiring groove.
4. Remove axial ow blade
axial ow blade
nut
5.Remove electric box assy
ProcedureStep

Related product manuals