EasyManua.ls Logo

Gree LSQWRF35VM/NaA-M - 4.2 Operation Flowcharts

Gree LSQWRF35VM/NaA-M
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
(2)Remove anticlockwise the blind plug located at the bottom of the heat exchanger to let
the chilled water flow out, after that, tighten the blind plug and reinstall the panel. (-
Note: place the drainage equipment beneath the drain pipe to prevent pollution
caused by the drain water.
NOTE
Keep the purge valve of the water system open in order to drain the evaporator and
condenser completely.
6 Introduction to the Display Panel
See the Operation Instructions for the Display Panel of the inverter modular type chillers for
more details.
7 Electric Wiring
7.1 External Wiring of the Electric Control Cabinet
LSQWRF35VM/NaA-M,LSQWRF60VM/NaA-M,LSQWRF65VM/NaA-M and
LSQWRF70VM/NaA-M
Note: the output control lines of the AC contactors for the running indicator, water pump 1,
water pump 2, auxiliary electric heater 1, auxiliary electric heater 2 can be wired to the
A Series Inverter Modular Air-cooled Chiller (Heat Pump)

Other manuals for Gree LSQWRF35VM/NaA-M

Related product manuals