EasyManua.ls Logo

Gree LSQWRF60VM/NhA-M - Page 100

Gree LSQWRF60VM/NhA-M
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
96
Test Operation, Troubleshooting and Maintenance
Replacement of the electric expansion valve
Note: check the whole system, pipelines and electric lines, cut off power supply and reclaim
refrigerant before replacement.
Steps Image Instructions
5. Replace it with a
new one.
Solder pipes.
Do charge nitrogen during soldering.
Protection measures should be
taken during soldering to prevent
surrounding objects from being burnt
out.
6. Tighten coils,
pipe clamps and
rubber pads;
vacuum the system;
recharge refrigerant
and then put back
the panel.
The bulge of the coil should match
with the recess of the main body of
the valve.
Keep the vacuum degree to -1.0bar.
Vacuuming period would be longer
for the repaired unit.
Charged refrigerant should be
the same as that stated at the
nameplate.
Power off the unit and then power it
on again.
Put back the panel.
Replacement of vapor-liquid separator
Note: properly reclaim refrigerant, prepare tools and keep good ventilation.
Steps Image Instructions
1. Remove front
panels.
Remove screws at the front panel.
Loosened screws should be put
together to
avoid loss.
Pull the front panel upwards and
then remove it.
Properly keep the removed front
panel to avoid from being damaged.
Note: there are two clasps at each
panel for connecting with side
panels.

Table of Contents

Other manuals for Gree LSQWRF60VM/NhA-M

Related product manuals