EasyManua.ls Logo

GreenWorks 27072 - Handlebar Assembly

GreenWorks 27072
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
ASSEMBLY
ASSEMBLING THE HANDLEBAR (See Figure. 4)
Align the holes on the upper handle with the holes on the lower handle. Insert the bolts, and
tighten them using the wing nuts provided.
Fold the handle base on the Fig.3 - 3.1
Step1: Release the wing nuts
Step2: Rotate the middle handle
base on the arrowhead 1
way (See Fig 3-1)
Fig. 4
Fig. 3.1
Fig. 3
LOWER HANDLE
UPPER
HANDLE
Wing nut
arrowhead 1

Other manuals for GreenWorks 27072

Related product manuals