EasyManua.ls Logo

Grindmaster Espressimo 1750 - Initial Preparation

Grindmaster Espressimo 1750
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial Preparation
Warning: To prevent damage to machine, boiler must be filled with water before turning main power switch on.
1.
2.
3.
4.
5.
6.
*Required to validate warranty. (See warranty for details).
Before operating the machine, please read the operation and instruction manual.
Needed for installation:
Remove machine from carton and position machine in operating location.
At this point, please refer to Installation Instructions on Page 6.
If there is a problem, consult the Troubleshooting Guide in this manual.
If you cannot correct a problem, call Grindmaster Corporation’s Hotline for help at 800-695-4500 or
+1-502-425-4776, Monday through Friday, 8 A.M. until 8 P.M., EST.
Access to cold water line with minimum of 30 P.S.I. pressure, drain, and heavy-duty grounded receptacle with its
own breaker. Models 2450 & 1750 use 115V, 20 AMP receptacle. Q models use 230V (3 wire plus ground), 20
AMP receptacle. E models use 230V, 15 AMP receptacles with proper plug installed by customer.
1
/
4
” copper tubing
(4)
1
/
4
” female flare fittings
In-line water filter system*
3
/
4
” ID flexible drain hose
IMPORTANT
Failure to use in-line water
filter voids warranty!
Page 3 Espressimo 2450 & 1750 Espresso Cappuccino Machines

Related product manuals