EasyManua.ls Logo

Gronomics RGBT 34-95 User Manual

Default Icon
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
ITEM QTY.
Parts List
1 4 1901R
2 2 1902R
3 10 4500T
4 2 4500TL
5 7 3100T
DESCRIPTION
Corner Post, 2 Dovetailed Sides, 4” x 4” x 19”
Center Post, 3 Dovetailed Sides, 4” x 4” x 19”
Side Rail, 45” x 5-1/2” x 7/8
Side Rail w/Logo, 45” x 5-1/2” x 7/8
Side Rail, 31” x 5-1/2” x 7/8
Raised Garden Bed (3 Tier 34” x 95”)
Assembly Instruction T & G
1
Parts Identi cation
Stack matching pieces in piles. Using the parts
list, locate and count the individual pieces and
verify that you have received the correct number
of pieces.
If any pieces are missing or replacement parts
are required, contact Gronomics at
1-855-299-6727.
NOTE: Ground preparation is optional,
however we recommend leveling area under
frame of product, or place product directly on
a flat level surface before filling with soil.
1
2
3
4
5
Item #: RGBT 34-95
Item #: RGBT 34-95S
Packaged & Inspected by: Date:
PART #
Product Care & Maintenance - Western Red Cedar will turn a weathered grey if left unfinished. Although no finish is required for
cedar products when used outdoors, a natural oil finish applied regularly will help maintain the beauty and minimize cracking and
drying. It is recommended to use Gronomics Garden Bed Oil (Item # GBO-1Q), a non-toxic, food safe finish that is very easy to
apply. Apply Oil when air and wind temperatures are between 50-90degrees. Avoid applying in direct sunlight.
Question and Answer IconNeed help?

Do you have a question about the Gronomics RGBT 34-95 and is the answer not in the manual?

Gronomics RGBT 34-95 Specifications

General IconGeneral
BrandGronomics
ModelRGBT 34-95
CategoryLawn and Garden Equipment
LanguageEnglish

Summary

Parts Identification

Product Care & Maintenance

Assembly Instructions

Side Rail Assembly

Assemble the garden bed by installing corner and center posts with side rails, positioning logo upside down.

End Rail And Center Support Rail Assembly

Install the 31" side rails into the slots at the bottom of the posts for end and center support.

Final Side Rail Assembly

Complete the side structure by installing remaining 45" and 31" side rails and flipping the bed right side up.

Garden Bed Completed

Final assembled garden bed. Raise center support rail when filling with soil.

Related product manuals