Installation
Operation Manual
&
Download
Manual
Growatt New Energy
Question and Answer IconNeed help?

Do you have a question about the Growatt MAX 70KTL3 LV and is the answer not in the manual?

Growatt MAX 70KTL3 LV Specifications

General IconGeneral
BrandGrowatt
ModelMAX 70KTL3 LV
CategoryInverter
LanguageEnglish

Summary

2 Safety Precautions

General Safety and Handling

Covers crucial safety guidelines for handling, installation, and maintenance to prevent injury.

Electrical Connection Safety Measures

Details critical safety protocols for electrical connections, emphasizing high-voltage risks.

Installation Safety Guidelines

Stresses the importance of reading the manual and ensuring power is off before installation.

5 Installation Guide

5.1 Basic Installation Requirements

Outlines fundamental requirements for inverter installation, including wall strength and space.

5.1 Basic Installation Requirements Continued

Continues detailing installation requirements, covering environmental and temperature factors.

5.4 Wall Mount Bracket Installation

Guides on how to install the wall mount bracket for securing the inverter.

5.5 Installing the Inverter

Details the steps for securely mounting the inverter onto the installed bracket.

6 Cable Connections

6.1 AC Side Connection

Instructions for making AC electrical connections, emphasizing safety and breaker requirements.

AC Side Connection Steps

Step-by-step guide for connecting AC cables, including terminal tightening and waterproofing.

6.2 DC Side Connection

Details safe procedures for connecting DC input cables from PV panels.

6.4 Ground Cable Connection

Details the grounding process for the inverter and system components for safety.

7 Commissioning

7.1 Inverter Commissioning

Guides on initial setup and configuration of the inverter after installation.

8 Monitoring System

8.1 Remote Data Monitoring

Introduces methods for remotely monitoring inverter performance via APP and web.

8.1.1 ShinePhone APP Monitoring

Guides on using the ShinePhone APP for remote inverter monitoring.

8.2 Local Data Monitoring

8.2.1 Shinephone App Local Monitoring

Instructions for using the ShinePhone app for local monitoring.

8.2.1.2 Local Monitoring & Debugging Tools

Details using local monitoring and debugging features of the app.

8.2.1.2 Local Monitoring & Debugging Tools Continued

Continued guide for local monitoring and debugging.

9 System Maintenance

9.2 Troubleshooting Guide

Introduction to troubleshooting common inverter issues.

9.2.2 Error Code Reference

Lists and explains various error codes and suggested solutions.

13 Contact Information