5 Installation
5.1 Basic installation requirements
A The installation location must be suitable for the energy storage machine’s weight for a long period time(Please
refer to the specification in chapter 10 about the weight of energy storage machine )
B The installation location must conforms with dimension of energy storage machine
C Do not install the unit on structures constructed of flammable or thermo labile materials
D The Ingress Protection rate is IP65 which means the unit can be installed indoors
E Battery installation option is not far below the position of energy storage machine
F The humidity of the installation location should be 0 ~ 95%
G The ambient temperature should be -25 ~40
H Energy storage machine can be installed in vertical or lean back on plane, Please refer to the below
Chart 5.1
I In order to ensure machine can run normally and easy to operate, please pay attention to provide
adequate space for energy storage machine, Please refer to below: