EasyManua.ls Logo

GrowlerWerks uKeg Nitro - uKeg Setup and Operation Basics; Nitro Gas Cartridge Installation; Adjusting Pressure and Pouring; Tap Handle Operation

GrowlerWerks uKeg Nitro
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
UKEG NITRO BASICS
Install Cartridge
Before filling.
Ensure dial is in off
position.
Charge Cap
Tighten sleeve quickly
and firmly.
Sleeve does not need
to bottom out.
A quick puff of gas is
normal.
1
.
2
.
OTHER TIPS:
Turn on pressure right away after filling.
After dispensing, use remaining gas to flush uKeg.
For best performance, we recommended GrowlerWerks
brand Nitro Gas.
e Cap
The dial controls the
pressure inside the uKeg
Nitro.
Turn to “Infuse” for nitro
infusion.
Turn to “Pour” for best
best performance
while pouring and
storing.
e Tap
Fold tap handle back
to lock.
Pull forward to pour.
ENJOY!
INSTALLING THE NITRO GAS CARTIDGE
ADJUSTING PRESSURE LOCKING TAP