EasyManua.ls Logo

Grundfos MQ Series - Pump Startup Procedure; Disposal

Grundfos MQ Series
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
English (US)
9.5 Startup
Before start-up, the pump must be filled with 1.2 to
1.5 gallons of water to enable it to self-prime,
see fig. 16. The pump is self-priming with a
maximum suction lift of 25 ft.
Fig. 16 Priming the pump
When started, the pump begins to self-prime.
When it has been primed, the pump will
automatically change over to normal operation.
If the priming has not been completed within
5 minutes, the pump will stop automatically and
attempt to restart after 30 minutes. It is possible to
reset the pump manually, see point 2 in the table of
section 10.1 Control panel.
TM01 9696 2600
Warning
Running the pump at a higher inlet
pressure than recommended (44 psi)
can cause the pump to leak.
Grundfos cannot be held responsible
for any damage to the pump and/or its
surroundings if this warning is not
followed.

Related product manuals