EasyManua.ls Logo

GTO PRO SL-2000 - Attaching Operator Housing and Warning Signs

Default Icon
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Mount the operator housing after
all installation procedures are
complete. Slide operator housing
over legs, align holes, and use
screws provided to attach housing
to operator.
IMPORTANT: Hang the two (2)
GTO Warning Signs (provided) on
both sides of the gate before
operating. Make sure all warning
signs and labels are in place. Make
sure that the packet containing end
user safety instructions and
warranty procedures remains
attached to the operator housing
(as shown in the illustration).
ATTACHING THE HOUSING
IMPORTANT
Safety Instructions

Related product manuals