6
Parts List
NOTE: Due to the production’s improvement, the unit you purchased may vary slightly from
below sketch.
1. Temperature control box
2. Shelves
3. Crisper cover
4. Crisper
5. Adjustable leg
6. Small bottle / egg racks
7. Bottle racks
NAMES OF THE PARTS
1. Temperature Control Box
2. Shelves
3. Crisper cover
4. Crisper
5. Adjustable foot
6. Pockets for small bottles
7. Pocket for big bottles
HOW TO OPERATE
Starting Your New Fridge
1. Clean the fridge thoroughly. Wipe the outside with a soft dry cloth, the interior with a clean
moist cloth.
2. Insert the power supply cord into the socket.
3. Turn the thermostat dial to “7”. Close the door and let the fridge operate for 15-20 minutes.