EasyManua.ls Logo

Haier HB16FMAA - Pre-Connection Waiting Period; Electrical Connection Safety

Haier HB16FMAA
384 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10- Installation
GB
30
WARNING!
To avoid risks a damaged power cord must be replaced by the customer service (see
warranty card).
10.8 Electrical connection
Before each connection check if:
power supply, socket and fusing are appropriate to the rating plate.
the power socket is earthed and no multi-plug or extension.
the power plug and socket are strictly according.
Connect the plug to a properly installed household socket.
10.7 Waiting time
To the maintenance-free lubrication oil is located in the
capsule of the compressor. This oil can get through
the closed pipe system during slanting transport. Be-
fore connecting the appliance to the power supply you
have to wait 2 hours (Fig. 10.7) so that the oil runs back
into the capsule.
2 h
10.7

Table of Contents

Related product manuals