EasyManuals Logo

Haier HBU-42CH03 User Manual

Haier HBU-42CH03
282 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background imageLoading...
Page #125 background image
Note: is the real time
analyser position
outdoor unit:
1.air outlet from side: the noise level is the average sound pressure level measured from front, left, right directions.
2.air outlet from top: the noise level is the average sound pressure level measured from front, back, left, right
directions.
measured point:
H ( height to the ground) = (h (unit height) + 1m) /2
and
,
it is 1m to each side.
Installation state: the unit should be placed on the flat floor or be mounted in horizontal
direction.
Testing method:
h
1m
1m
1m
1m
The specifications for other outdoor units please refer to the corresponding indoor unit specification.
-125-
Specifications

Other manuals for Haier HBU-42CH03

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Haier HBU-42CH03 and is the answer not in the manual?

Haier HBU-42CH03 Specifications

General IconGeneral
BrandHaier
ModelHBU-42CH03
CategoryAir Conditioner
LanguageEnglish

Related product manuals